ArchivesSpace Public Interface

Pre-Revolutionary War Materials Edit

Summary

Level of Description
Series

Dates

  • 1743/4-1772, 1945 (Creation)

Notes

  • Abstract

    The 1743/4 date is not due to misunderstanding but due to double dating, documents signed between what we think of as January 1 and March 25 are dated with a slash due to the use of two different calendars at that point in time before a 1750 ruling that was implemented in 1752 forced England and its colonies to use the Gregorian calendar and not the Julian.

Instances

  • Type
    Text
    Container 1 Type
    Box
    Container 1 Indicator
    1
  • Type
    Text
    Container 1 Type
    Box
    Container 1 Indicator
    2

Components